PetroBest · Oil & Gas Field Surface Processing
Underground Gas Storage Injection and
After natural gas is processed, compressed and metered, it is injected into the underground gas storage facility.
Request a quotationApplication
During gas production, the extracted gas is subsequently heated, choked, dehydrated, filtered, and metered before being delivered into the pipeline system.
In a typical surface processing train the sequence is: Wellhead → Separation → Treating → Metering → Pipeline.
Reference projects
- 2022 — 42Mpa metering and regulating skid for the Wenjisang Gas Storage project, Tuha Oilfield
- 2022 — Wen 23 Gas Storage of PipeChina West-East Gas Pipeline – TEG dehydration system - 10 million cubic meters per day
- 2024 — Caofeidian Offshore Gas Storage, Jidong Oilfield – integrated ground equipment - 30 million cubic meters per day
Project references are taken from the PetroBest Group Profile 2026.
Capacity, design conditions and scope of supply are confirmed per project against current drawings.
Questions
What is a underground gas storage injection and production unit used for?
After natural gas is processed, compressed and metered, it is injected into the underground gas storage facility.
Need a underground gas storage injection and for your project?
Send the design conditions, medium, flow rate and pressure range. We return a technical proposal and a price.